Update:  April 21, 2016

Reservoir construction snapshot #4

The road at West Silver Lake Blvd. is a two way street again! It was converted into a one-way back in March 2015. New signs have also been placed along the Silver Lake Reservoirs' enclosing gates. The area within the reservoirs has been more heavily populated by workers and large construction trucks than during previous weeks. A few visible pipes can now be seen resting above the dirt path waiting to be buried. Check out the glimpse we got of the inside of one.